R&D and Testing
Project records show verified development stages and completed and planned tests approved for public disclosure.
Research methodology
- Problem and needs analysis
- Scientific research
- Hypothesis and conceptual design
- Mathematical modelling
- Digital simulation
- Prototype development
- Controlled testing
- Independent validation
Testing and validation methods
Findings are assessed separately for each method.
- Digital simulation
- Physical prototype testing
- Laboratory validation
- Field validation
Current project stages
- Time Density — SDTD
- Theoretical modelling and numerical evaluation
- Thorium — Fuel Cycle Research
- Analytical research and model assessment
- Amygdala Operatorship
- Conceptual and theoretical research
- SENTINEL-M
- System design, digital validation and software prototyping
- SENTINEL FIRE WALL
- Conceptual research and design
- SENTINEL CIVIL — SENTINEL-C
- Conceptual research and design
Türkçe